Construction of Budapest Underground Station (M4) Budapest, Hungary (2006-2010)
pit enclosute with diaphragm wall and rank of pile, rank of pile anchorage, drainage system construction, soil compaction, public work construction, soil excavation, capping beam construction, base slab construction, water insulation, reinforced structure construction, impregnation by injection, ground water lowering
Moricz Zsigmond Square Metro Station

Wierendeel girder

Wierendeel girder and platform level

Rainforced concrete structure

Cutting

Excavation under Wierendeel girder

Structure strutted by temporary steel pipes

Bearing base

Top slab siding

Knees on platform level